Parkfast Blog

Tag: Queens-Midtown

ParkFast Alert: Weekend Bridge and Street Closures – May 24-26

Friday, May 23, 2014 [caption id="attachment_1397" align="aligncenter" width="512"] Anthony Correia / Shutterstock.com[/caption] One of four lanes on the Williamsburg Bridge eastbound to Brooklyn will be closed on Saturday from 6 am to 12:30 pm to facilitate NYCDOT bridge maintenance. Mulberry Street between Canal Street and Broome Street and Hester Street between Mott Street and Baxter Street will be closed Friday, Saturday and Sunday from 5:30 pm to 9 pm for the Little Italy Pedestrian Mall.…

Gridlock Alert for Wednesday through Friday, December 18-20

Tuesday, December 17, 2013 Wednesday, December 18, Thursday, December 19 and Friday, December 20 are Holiday Gridlock Alert Days, among the heaviest vehicular traffic days of the holiday season. Residents, commuters and visitors are strongly advised to use mass transit, bike or walk on these days.

Alert: Weekend Bridge and Street Closures – September 21-22

Friday, September 20, 2013 One tube of the Brooklyn Battery Hugh L. Carey Tunnel will be closed from 9 pm Friday through 5 am Monday. One lane will be open in each direction in the remaining tube. The Outerbridge Crossing will be closed in both directions between 10 pm to 5 am Monday nights through Friday mornings and from 11:59 pm Friday to 7 am on Saturdays through October to facilitate Port Authority roadway repairs…

Weekend Bridge and Street Closures – September 7-8

Friday, September 6, 2013 The Brooklyn Bridge will be closed to Manhattan-bound traffic from 12:01 am Saturday until 6 am Monday. Motorists should use the Hugh L. Carey (Brooklyn Battery) Tunnel, Williamsburg Bridge, RFK Bridge or Queens Midtown Tunnel, into Manhattan. Throughout this closure the Manhattan Bridge will accommodate 5 lanes of traffic inbound/westbound and two lanes outbound/eastbound. The northbound Brooklyn Queens Expressway will be closed from Exit 28A (Cadman Plaza West) to Exit 29A…

Weekend Bridge and Street Closures – August 24-25

Friday, August 23, 2013 The Brooklyn Bridge will be closed to Manhattan-bound traffic from 12:01 am on Saturday to noon on Sunday for rehabilitation work. Motorists should consider using the Manhattan Bridge, Williamsburg Bridge or Hugh L. Carey Brooklyn Battery Tunnel (MTA toll facility) Brooklyn-bound traffic will access the Bridge from Pearl Street or Centre Street, using a contraflow configuration. This weekend only, there will be additional access to the bridge via the Park Row…

Weekend Bridge and Street Closures – August 17-18

Friday, August 16, 2013 The Brooklyn Bridge will be closed to Manhattan-bound traffic from 12:01 am on Sunday to 5 am on Monday for rehabilitation work. Motorists should consider using the Williamsburg Bridge or the toll facilities at the Hugh L. Carey (formerly Brooklyn Battery) Tunnel, RFK Bridge or Queens Midtown Tunnel. Throughout this closure the Manhattan Bridge will accommodate 5 lanes of traffic inbound/westbound and two lanes outbound/eastbound. Brooklyn-bound traffic will access the Bridge…

Weekend Bridge and Street Closures – July 27-28

Friday, July 26, 2013 The south tube of the Queens Midtown Tunnel will be closed from 2 am Saturday to 5 am Monday for MTA repair work. Two-way traffic operations will be in effect in the north tube for cars and NYCT buses. Commercial traffic must use an alternate route during these hours. The Willis Avenue Bridge will be fully closed to motorists and pedestrians on Saturday from 2 am to 6 am for swing…

ParkFast Alert: Weekend Bridge and Street Closures – July 20-21

Friday, July 19, 2013 The Brooklyn Bridge will be closed to Manhattan-bound traffic from 12:01 am Saturday to 6 am Monday for work on the bridge structure. Motorists proceeding inbound/northbound from south Brooklyn via the Belt Parkway and Gowanus Expressway should use 3rd Avenue/Hamilton Avenue into the Hugh L. Carey Brooklyn Battery Tunnel (toll facility) as the best route into lower Manhattan. Motorists proceeding inbound/westbound from Queens/Long Island should consider the Williamsburg Bridge, or the…

ParkFast Alert: Weekend Bridge and Street Closures – May 11-12

Friday, May 10, 2013 One of three eastbound lanes on the Brooklyn Bridge will be closed from 6 am to 2 pm on Saturday to facilitate bridge maintenance.One of two eastbound (Queens-bound) lanes on the south upper roadway of the Ed Koch Queensboro Bridge may be closed from 6 am to 2 pm Saturday and/or Sunday through June to facilitate overhead lighting work. The south tube of the Battery Park Underpass between Route 9A/West Street…

ParkFast Alert: Weekend Bridge and Street Closures – May 4-5

Friday, May 3, 2013 The following closures will take place on Sunday for the Five Borough Bike Tour. The lower level of the Verrazano Bridge from Brooklyn to Staten Island will be closed from 12:01 am to 6 pm. The Brooklyn-bound lower level will also close at 12:01 am. Two lanes will reopen about 8 am. The upper level will be open in both directions. Traffic exiting the Hugh L. Carey (Brooklyn Battery) Tunnel in…